Altens Serenity Offering
A single contract integrating infrastructure, energy, and their operation.
Infrastructure – Electricity – Operation – Secured kWh Price
Switch to electric with no initial investment in your charging infrastructure.
A turnkey solution integrating infrastructure, renewable energy, and operations, for a tailored, integrated charging solution with a clear bill thanks to simplified pricing.
ALTENS supports businesses in accelerating their energy transition through a multi-energy offering.
A single contract integrating infrastructure, energy, and their operation.
Infrastructure – Electricity – Operation – Secured kWh Price
Selection of your EV charging infrastructure equipment • Contributes to a clear understanding of your TCO (Total Cost of Ownership) • Test our TCO simulator: electric vs. diesel • Design of a global transition project to electric (photovoltaic, EV charging infrastructure, electricity contract, Energy Savings Certificates) • Support for Energy Savings Certificates
We design, finance, install, operate, and supply your infrastructure: this is the ALTENS / TSG model.
Two experts for an integrated electric charging solution.
ALTENS, an expert in energy and financing, partners with TSG, a major European player in mobility-related technical infrastructure and services, to support you from the design to the operation of your charging infrastructure.
The PUR-ELEC offer combines everything you need to electrify your fleet into a single contract. Available with or without initial investment (CAPEX), PUR-ELEC allows you to choose the financing model best suited to your strategy. In the OPEX version, infrastructure is integrated into your contract for a solution with no upfront investment.
scaled to meet your operational needs
100% renewable with French guarantee of origin
Altens finances, builds, and operates according to a defined maintenance policy
throughout the duration of the contract
ALTENS supports you at every stage of your project to guarantee a high-performance infrastructure adapted to your needs.
at the depot overnight
(50 to 80 kW)
at the depot (150 to 400 kW)
loading or unloading (50 to 250 kW)
on the road or intermediate (400 to 1,250 kW)
Benefit from the Altens Energy Bonus to accelerate your energy transition and finance your decarbonization projects. Our experts support you at every step to maximize the value of your CEEs.
Infrastructure, CEE grants, price per kWh, TCO: the ALTENS simulator brings together key data to quickly evaluate your electrification project. Get an initial estimate of investments, available grants, and charging costs to inform your choices from the very first discussions.
A simple tool to quote, compare, and build your electric project
Would you like to discover our global offer (charging infrastructure and electricity), set up charging stations only, or design a project combining solar carports and EV charging?
Yes, and it is now an essential part of decarbonizing road transport. Without charging infrastructure, there are no electric vehicles in operation: it is the first building block of the project, even before the vehicle.
It is also an economically sound choice. Thanks to CEE bonuses available for the purchase or lease of electric vehicles, the TCO of an electrified fleet quickly becomes competitive compared to diesel.
The question remains “how.” You can invest and own your own infrastructure (CAPEX), but if committing time and capital to this subject is not your priority, the Serenity charging offer allows you to electrify your fleet without an initial investment in infrastructure, for a simple price per kWh over the duration of the contract.
Yes. ALTENS acts as a global integrator for the entire project in partnership with TSG:
You don’t have to coordinate multiple service providers yourself: ALTENS manages the project from the first quote to daily operations.
Several programs can reduce the remaining cost of a charging infrastructure project:
These programs regularly change in terms of amounts, eligibility criteria, and timelines. Your ALTENS contact will identify the grants available for your project and help you prepare the corresponding applications.
The price per kWh offered as part of the Serenity charging offer integrates all the costs of your project over the duration of the contract (3 to 7 years): the cost of the infrastructure (stations, installation work, connection), the cost of the electricity consumed, and the cost of operations (supervision, preventive and corrective maintenance, dynamic station management).
These various items are amortized over the duration of the contract and converted into a single price per kilowatt-hour, to which a monthly subscription is added. You thus track a single price, which covers both infrastructure and energy, rather than managing investment, maintenance, and an electricity supply contract separately.
This price is calculated based on your fleet profile (number of vehicles, daily charging needs, site configuration) using the ALTENS simulator, which allows us to communicate it to you from the very first discussions.
The choice of station type depends on your operational profile (available charging time, required power, number of vehicles):
ALTENS scales the solution most suited to your activity (vehicle rotation time, distances traveled, site constraints) rather than applying a standard default solution.
Because ALTENS approaches your electrification project holistically, not just from the perspective of charging stations:
The goal: to allow you to electrify your fleet with peace of mind, with a clear vision of the cost and timeline from the very first discussions.